V1.4 SP4.0
From FPDS-NG
Schedule
Description | Start Date | End Date |
---|---|---|
BETA Installation | Monday June 25, 2010 | Monday June 25, 2010 |
Functional Qualification Testing | Tuesday June 28, 2010 | Thursday June 30, 2010 |
Installation in Production | Friday July 09, 2010 | Friday July 09, 2010 |
Document Changes
Documentation | Changes Required |
---|---|
XML Specifications | No |
Web Services | No |
Data Dictionary | Yes |
NASA Specific Data Dictionary | No |
Use Case Summary | No |
Validation Rules | Yes |
Online Help | Yes |
Computer-Based Training | No |
Report Manual | No |
SPR Listing
SPR # | Problem | Solution | Impact to Users and Integrators |
---|---|---|---|
FPDSNG-3629 | CCR will be stopping the dissemination of SIC Code from v4.10.3 – Scheduled for July 28, 2010. FPDS-NG CCR Loading Process needs to be changed to accommodate the File Format changes. |
The CCR loading process shall be modified to read all the records from the CCR flat file without the “SIC Code” and “SIC Code Counter”. |
No |
FPDSNG-3630 | The TAS Codes that may be used for ARRA (American Recovery and Reinvestment Act) contracts are not limited to Recovery contracts. To give the users the ability to mark the contracts as ‘Recovery’, the data element “Initiative” shall be changed from text box to dropdown and made as ‘Optional’ for Version 1.4. |
“The value <<value>> for Data Element "Initiative" is invalid.”
“If “Initiative” is selected then "Treasury Account Symbol" must have a valid value.”
|
No |
FPDSNG-3631, FPDSNG-3632 | The TAS Codes may be used for ARRA (American Recovery and Reinvestment Act) contracts but are not limited to Recovery contracts. The “Initiative” data element is not present in Version 1.3 XML. Hence, for business services Version 1.3, the contract can be marked as “ARRA” through the “Description of Requirement” element. |
ARRA::YES::ARRA
“Initiative should be of format ‘ARRA::YES::ARRA’ and should not contain special characters.”
“If “Initiative” is selected then "Treasury Account Symbol" must have a valid value.”
|
No |
FPDSNG-3629 | CCR will be stopping the dissemination of SIC Code from v4.10.3 – Scheduled for July 28, 2010. FPDS-NG CCR Loading Process needs to be changed to accommodate the File Format changes. |
The CCR loading process shall be modified to read all the records from the CCR flat file without the “SIC Code” and “SIC Code Counter”. |
No |
FPDSNG-3629 | CCR will be stopping the dissemination of SIC Code from v4.10.3 – Scheduled for July 28, 2010. FPDS-NG CCR Loading Process needs to be changed to accommodate the File Format changes. |
The CCR loading process shall be modified to read all the records from the CCR flat file without the “SIC Code” and “SIC Code Counter”. |
No |