Difference between revisions of "Data Management V1.4 SP19.0"

From FPDS-NG

 
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Listed below are the data management fixes has been completed on October 7, 2011:
+
Listed below is the data management fix that shall be completed as part of V 1.4 SP 19.0. The Production deployment date is 03/29/2013.
  
 
<TABLE id="box-table-a" border=2 style="width: 800px">
 
<TABLE id="box-table-a" border=2 style="width: 800px">
 
<th width=11% align="center"><b>SPR #</b></th><th width=35% align="center"><b>Problem</b></th><th width=15% align="center"><b>Awards/IDVs Fixed</b></th>
 
<th width=11% align="center"><b>SPR #</b></th><th width=35% align="center"><b>Problem</b></th><th width=15% align="center"><b>Awards/IDVs Fixed</b></th>
 
<tr>
 
<tr>
<td style="width:95px" valign="top">FPDSHD-64205</td>
+
<td style="width:95px" valign="top">FPDSHD-114916</td>
<td valign="top">The value ‘BSDF’ will be removed from Contracts for the below data elements
+
<td valign="top">Major Program and Program Acronym shall be updated on 2859 DOD IDCs and their Modifications.
*National Interest Action Code
 
*Commercial Item Test Program
 
*Local Area Set Aside
 
</td>
 
<td>433,686 updates</td>
 
</tr>
 
<tr>
 
<td style="width:95px" valign="top">FPDSHD-72202, 83129, 86488</td>
 
<td valign="top">For Awards where “PSC code” starts with 89, “Place of Manufacture” will be updated to ‘Not a manufactured end product’ if it is not already.</td>
 
<td valign="top">
 
304,290 updates
 
 
</td>
 
</td>
 +
<td>23,429 updates</td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Latest revision as of 19:18, 27 March 2013

Listed below is the data management fix that shall be completed as part of V 1.4 SP 19.0. The Production deployment date is 03/29/2013.

SPR #ProblemAwards/IDVs Fixed
FPDSHD-114916 Major Program and Program Acronym shall be updated on 2859 DOD IDCs and their Modifications. 23,429 updates